Chad vs Kyrgyzstan: Time to export (days)

Chad
70 DB06-15 methodology
in 2014
Kyrgyzstan
63 DB06-15 methodology
in 2014
Chad rank
5th
Kyrgyzstan rank
6th

Time to export (days) over time

  • Chad
  • Kyrgyzstan
020406080200520092014

How they compare

Chad currently reports 70 DB06-15 methodology against 63 DB06-15 methodology in Kyrgyzstan, a difference of 7 DB06-15 methodology.

That makes Chad's figure about 1.1 times Kyrgyzstan's.

Across all 10 years both countries report, Chad has been ahead every year.

Chad ranks 5th and Kyrgyzstan ranks 6th of 181 countries.

Chad has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Chad Kyrgyzstan Difference Ahead
2000s 77.4 DB06-15 methodology 63.8 DB06-15 methodology 13.6 DB06-15 methodology Chad
2010s 73.6 DB06-15 methodology 63 DB06-15 methodology 10.6 DB06-15 methodology Chad

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time to export (days), Chad or Kyrgyzstan?
Chad, at 70 DB06-15 methodology against 63 DB06-15 methodology in Kyrgyzstan as of 2014.
What is the difference in time to export (days) between Chad and Kyrgyzstan?
7 DB06-15 methodology, with Chad ahead.
How many years of comparable data are there for Chad and Kyrgyzstan?
10 years are reported by both, from 2005 to 2014.
How do Chad and Kyrgyzstan rank globally for time to export (days)?
Chad ranks 5th and Kyrgyzstan ranks 6th of 181 countries.
Where does this data come from?
The World Bank, published as Time to export (days) (DB06-15 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Time to export (days) (DB06-15 methodology)
Unit
DB06-15 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The time to export records the time associated with exporting a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calculated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to firms located in an export processing zone, or only to certain accredited firms under authorized economic operator programs, are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.