Chad vs Iraq: Time to export (days)
Time to export (days) over time
- Chad
- Iraq
How they compare
Iraq currently reports 80 DB06-15 methodology against 70 DB06-15 methodology in Chad, a difference of 10 DB06-15 methodology.
That makes Iraq's figure about 1.1 times Chad's.
Across all 10 years both countries report, Iraq has been ahead every year.
Chad ranks 5th and Iraq ranks 2nd of 181 countries.
Iraq has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Chad | Iraq | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 77.4 DB06-15 methodology | 102 DB06-15 methodology | 24.6 DB06-15 methodology | Iraq |
| 2010s | 73.6 DB06-15 methodology | 80 DB06-15 methodology | 6.4 DB06-15 methodology | Iraq |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time to export (days), Chad or Iraq?
- Iraq, at 80 DB06-15 methodology against 70 DB06-15 methodology in Chad as of 2014.
- What is the difference in time to export (days) between Chad and Iraq?
- 10 DB06-15 methodology, with Iraq ahead.
- How many years of comparable data are there for Chad and Iraq?
- 10 years are reported by both, from 2005 to 2014.
- How do Chad and Iraq rank globally for time to export (days)?
- Chad ranks 5th and Iraq ranks 2nd of 181 countries.
- Where does this data come from?
- The World Bank, published as Time to export (days) (DB06-15 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time to export records the time associated with exporting a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calculated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to firms located in an export processing zone, or only to certain accredited firms under authorized economic operator programs, are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.