Cape Verde vs Gabon: Time to export (days)
Time to export (days) over time
- Cape Verde
- Gabon
How they compare
Cape Verde currently reports 20 DB06-15 methodology against 20 DB06-15 methodology in Gabon, a difference of 0 DB06-15 methodology.
The two have swapped places 1 time across 10 shared years of data; in 2005 it was Cape Verde ahead.
Cape Verde ranks 75th and Gabon ranks 75th of 181 countries.
Across the 2 decades both report, Cape Verde averaged higher in 1 and Gabon in 1.
Head to head by decade
| Decade | Cape Verde | Gabon | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 20.6 DB06-15 methodology | 19.4 DB06-15 methodology | 1.2 DB06-15 methodology | Cape Verde |
| 2010s | 19.2 DB06-15 methodology | 20 DB06-15 methodology | 0.8 DB06-15 methodology | Gabon |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time to export (days), Cape Verde or Gabon?
- Cape Verde, at 20 DB06-15 methodology against 20 DB06-15 methodology in Gabon as of 2014.
- What is the difference in time to export (days) between Cape Verde and Gabon?
- 0 DB06-15 methodology, with Cape Verde ahead.
- How many years of comparable data are there for Cape Verde and Gabon?
- 10 years are reported by both, from 2005 to 2014.
- How do Cape Verde and Gabon rank globally for time to export (days)?
- Cape Verde ranks 75th and Gabon ranks 75th of 181 countries.
- Where does this data come from?
- The World Bank, published as Time to export (days) (DB06-15 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time to export records the time associated with exporting a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calculated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to firms located in an export processing zone, or only to certain accredited firms under authorized economic operator programs, are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.