Botswana vs Sao Tome and Principe: Time to export (days)
Time to export (days) over time
- Botswana
- Sao Tome and Principe
How they compare
Botswana currently reports 27 DB06-15 methodology against 26 DB06-15 methodology in Sao Tome and Principe, a difference of 1 DB06-15 methodology.
Across all 10 years both countries report, Botswana has been ahead every year.
Botswana ranks 38th and Sao Tome and Principe ranks 40th of 181 countries.
Botswana has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Botswana | Sao Tome and Principe | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 32 DB06-15 methodology | 27 DB06-15 methodology | 5 DB06-15 methodology | Botswana |
| 2010s | 27.4 DB06-15 methodology | 26.2 DB06-15 methodology | 1.2 DB06-15 methodology | Botswana |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time to export (days), Botswana or Sao Tome and Principe?
- Botswana, at 27 DB06-15 methodology against 26 DB06-15 methodology in Sao Tome and Principe as of 2014.
- What is the difference in time to export (days) between Botswana and Sao Tome and Principe?
- 1 DB06-15 methodology, with Botswana ahead.
- How many years of comparable data are there for Botswana and Sao Tome and Principe?
- 10 years are reported by both, from 2005 to 2014.
- How do Botswana and Sao Tome and Principe rank globally for time to export (days)?
- Botswana ranks 38th and Sao Tome and Principe ranks 40th of 181 countries.
- Where does this data come from?
- The World Bank, published as Time to export (days) (DB06-15 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time to export records the time associated with exporting a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calculated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to firms located in an export processing zone, or only to certain accredited firms under authorized economic operator programs, are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.