Bangladesh vs East Timor: Time to export (days)

Bangladesh
28.34 DB06-15 methodology
in 2014
East Timor
28 DB06-15 methodology
in 2014
Bangladesh rank
34th
East Timor rank
35th

Time to export (days) over time

  • Bangladesh
  • East Timor
010203040200520092014

How they compare

Bangladesh currently reports 28.34 DB06-15 methodology against 28 DB06-15 methodology in East Timor, a difference of 0.34 DB06-15 methodology.

Across all 10 years both countries report, Bangladesh has been ahead every year.

Bangladesh ranks 34th and East Timor ranks 35th of 181 countries.

Bangladesh has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Bangladesh East Timor Difference Ahead
2000s 34.2 DB06-15 methodology 28 DB06-15 methodology 6.2 DB06-15 methodology Bangladesh
2010s 28.78 DB06-15 methodology 28 DB06-15 methodology 0.78 DB06-15 methodology Bangladesh

Averages of every year both report within each decade.

Frequently asked questions

Which has higher time to export (days), Bangladesh or East Timor?
Bangladesh, at 28.34 DB06-15 methodology against 28 DB06-15 methodology in East Timor as of 2014.
What is the difference in time to export (days) between Bangladesh and East Timor?
0.34 DB06-15 methodology, with Bangladesh ahead.
How many years of comparable data are there for Bangladesh and East Timor?
10 years are reported by both, from 2005 to 2014.
How do Bangladesh and East Timor rank globally for time to export (days)?
Bangladesh ranks 34th and East Timor ranks 35th of 181 countries.
Where does this data come from?
The World Bank, published as Time to export (days) (DB06-15 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Time to export (days) (DB06-15 methodology)
Unit
DB06-15 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The time to export records the time associated with exporting a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calculated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to firms located in an export processing zone, or only to certain accredited firms under authorized economic operator programs, are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.