Armenia vs Bosnia and Herzegovina: Time to export (days)
Time to export (days) over time
- Armenia
- Bosnia and Herzegovina
How they compare
Armenia currently reports 16 DB06-15 methodology against 16 DB06-15 methodology in Bosnia and Herzegovina, a difference of 0 DB06-15 methodology.
The two have swapped places 1 time across 10 shared years of data; in 2005 it was Armenia ahead.
Armenia ranks 100th and Bosnia and Herzegovina ranks 100th of 183 countries.
Across the 2 decades both report, Armenia averaged higher in 1 and Bosnia and Herzegovina in 1.
Head to head by decade
| Decade | Armenia | Bosnia and Herzegovina | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 32 DB06-15 methodology | 20 DB06-15 methodology | 12 DB06-15 methodology | Armenia |
| 2010s | 16 DB06-15 methodology | 16.2 DB06-15 methodology | 0.2 DB06-15 methodology | Bosnia and Herzegovina |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher time to export (days), Armenia or Bosnia and Herzegovina?
- Armenia, at 16 DB06-15 methodology against 16 DB06-15 methodology in Bosnia and Herzegovina as of 2014.
- What is the difference in time to export (days) between Armenia and Bosnia and Herzegovina?
- 0 DB06-15 methodology, with Armenia ahead.
- How many years of comparable data are there for Armenia and Bosnia and Herzegovina?
- 10 years are reported by both, from 2005 to 2014.
- How do Armenia and Bosnia and Herzegovina rank globally for time to export (days)?
- Armenia ranks 100th and Bosnia and Herzegovina ranks 100th of 183 countries.
- Where does this data come from?
- The World Bank, published as Time to export (days) (DB06-15 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time to export records the time associated with exporting a standardized cargo of goods by sea transport through 4 predefined stages: document preparation; customs clearance and inspections; inland transport and handling; and port and terminal handling. It is calculated in calendar days. The time calculation for each of the 4 predefined stages starts from the moment the stage is initiated and runs until it is completed. Fast-track procedures applying only to firms located in an export processing zone, or only to certain accredited firms under authorized economic operator programs, are not taken into account because they are not available to all trading companies. Sea transport time is not included. It is assumed that neither the exporter nor the importer wastes time and that each commits to completing the process without delay. It is assumed that document preparation, inland transport and handling, customs clearance and inspections, and port and terminal handling require a minimum time of 1 day each and cannot take place simultaneously. The component indicator is computed based on the methodology in the DB06-15 studies.