Jamaica vs Lebanon: Renewable energy electricity output
Jamaica
423 GWh
in 2015
Lebanon
479 GWh
in 2015
Jamaica rank
125th
Lebanon rank
123rd
Renewable energy electricity output over time
- Jamaica
- Lebanon
How they compare
Lebanon currently reports 479 GWh against 423 GWh in Jamaica, a difference of 56 GWh.
That makes Lebanon's figure about 1.1 times Jamaica's.
The two have swapped places 2 times across 26 shared years of data; in 1990 it was Lebanon ahead.
Jamaica ranks 125th and Lebanon ranks 123rd of 230 countries.
Lebanon has averaged higher in every one of the 3 decades both report.
Head to head by decade
| Decade | Jamaica | Lebanon | Difference | Ahead |
|---|---|---|---|---|
| 1990s | 263.5 GWh | 683.8 GWh | 420.3 GWh | Lebanon |
| 2000s | 257.4 GWh | 726.4 GWh | 469 GWh | Lebanon |
| 2010s | 394.67 GWh | 765.33 GWh | 370.67 GWh | Lebanon |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher renewable energy electricity output, Jamaica or Lebanon?
- Lebanon, at 479 GWh against 423 GWh in Jamaica as of 2015.
- What is the difference in renewable energy electricity output between Jamaica and Lebanon?
- 56 GWh, with Lebanon ahead.
- How many years of comparable data are there for Jamaica and Lebanon?
- 26 years are reported by both, from 1990 to 2015.
- How do Jamaica and Lebanon rank globally for renewable energy electricity output?
- Jamaica ranks 125th and Lebanon ranks 123rd of 230 countries.
- Where does this data come from?
- World Bank and International Energy Agency (IEA Statistics © OECD/IEA, http://www.iea.org/stats/index.asp), published as Renewable energy electricity output (GWh). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Renewable energy electricity output (GWh): Total number of GWh generated by renewable power plants, including wind, solar PV, solar thermal, hydro, marine, geothermal, biomass, renewable municipal waste, liquid biofuels and biogas. Electricity production for hydro pumpted storage is excluded.