Bangladesh vs Mauritius: Renewable energy electricity output
Bangladesh
724 GWh
in 2015
Mauritius
681 GWh
in 2015
Bangladesh rank
117th
Mauritius rank
118th
Renewable energy electricity output over time
- Bangladesh
- Mauritius
How they compare
Bangladesh currently reports 724 GWh against 681 GWh in Mauritius, a difference of 43 GWh.
That makes Bangladesh's figure about 1.1 times Mauritius's.
The two have swapped places 2 times across 26 shared years of data; in 1990 it was Bangladesh ahead.
Bangladesh ranks 117th and Mauritius ranks 118th of 230 countries.
Bangladesh has averaged higher in every one of the 3 decades both report.
Head to head by decade
| Decade | Bangladesh | Mauritius | Difference | Ahead |
|---|---|---|---|---|
| 1990s | 750.1 GWh | 305.8 GWh | 444.3 GWh | Bangladesh |
| 2000s | 760.3 GWh | 561.9 GWh | 198.4 GWh | Bangladesh |
| 2010s | 812.17 GWh | 609.5 GWh | 202.67 GWh | Bangladesh |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher renewable energy electricity output, Bangladesh or Mauritius?
- Bangladesh, at 724 GWh against 681 GWh in Mauritius as of 2015.
- What is the difference in renewable energy electricity output between Bangladesh and Mauritius?
- 43 GWh, with Bangladesh ahead.
- How many years of comparable data are there for Bangladesh and Mauritius?
- 26 years are reported by both, from 1990 to 2015.
- How do Bangladesh and Mauritius rank globally for renewable energy electricity output?
- Bangladesh ranks 117th and Mauritius ranks 118th of 230 countries.
- Where does this data come from?
- World Bank and International Energy Agency (IEA Statistics © OECD/IEA, http://www.iea.org/stats/index.asp), published as Renewable energy electricity output (GWh). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Renewable energy electricity output (GWh): Total number of GWh generated by renewable power plants, including wind, solar PV, solar thermal, hydro, marine, geothermal, biomass, renewable municipal waste, liquid biofuels and biogas. Electricity production for hydro pumpted storage is excluded.