Angola vs Morocco: Renewable energy electricity output
Angola
5,192 GWh
in 2015
Morocco
4,410 GWh
in 2015
Angola rank
79th
Morocco rank
82nd
Renewable energy electricity output over time
- Angola
- Morocco
How they compare
Angola currently reports 5,192 GWh against 4,410 GWh in Morocco, a difference of 782 GWh.
That makes Angola's figure about 1.2 times Morocco's.
The two have swapped places 9 times across 26 shared years of data; in 1990 it was Morocco ahead.
Angola ranks 79th and Morocco ranks 82nd of 230 countries.
Across the 3 decades both report, Angola averaged higher in 2 and Morocco in 1.
Head to head by decade
| Decade | Angola | Morocco | Difference | Ahead |
|---|---|---|---|---|
| 1990s | 877.6 GWh | 1,195 GWh | 317 GWh | Morocco |
| 2000s | 1,967 GWh | 1,412 GWh | 555.7 GWh | Angola |
| 2010s | 4,414 GWh | 3,536 GWh | 877.67 GWh | Angola |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher renewable energy electricity output, Angola or Morocco?
- Angola, at 5,192 GWh against 4,410 GWh in Morocco as of 2015.
- What is the difference in renewable energy electricity output between Angola and Morocco?
- 782 GWh, with Angola ahead.
- How many years of comparable data are there for Angola and Morocco?
- 26 years are reported by both, from 1990 to 2015.
- How do Angola and Morocco rank globally for renewable energy electricity output?
- Angola ranks 79th and Morocco ranks 82nd of 230 countries.
- Where does this data come from?
- World Bank and International Energy Agency (IEA Statistics © OECD/IEA, http://www.iea.org/stats/index.asp), published as Renewable energy electricity output (GWh). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Renewable energy electricity output (GWh): Total number of GWh generated by renewable power plants, including wind, solar PV, solar thermal, hydro, marine, geothermal, biomass, renewable municipal waste, liquid biofuels and biogas. Electricity production for hydro pumpted storage is excluded.