Bosnia and Herzegovina vs Poland: Rate of electrification
Bosnia and Herzegovina
38.47
in 2022
Poland
35.48
in 2023
Bosnia and Herzegovina rank
17th
Poland rank
19th
Rate of electrification over time
- Bosnia and Herzegovina
- Poland
How they compare
Bosnia and Herzegovina currently reports 38.47 against 35.48 in Poland, a difference of 2.99.
That makes Bosnia and Herzegovina's figure about 1.1 times Poland's.
The two have swapped places 2 times across 9 shared years of data; in 2014 it was Poland ahead.
Bosnia and Herzegovina ranks 17th and Poland ranks 19th of 39 countries.
Across the 2 decades both report, Bosnia and Herzegovina averaged higher in 1 and Poland in 1.
Head to head by decade
| Decade | Bosnia and Herzegovina | Poland | Difference | Ahead |
|---|---|---|---|---|
| 2010s | 32.12 | 36.05 | 3.93 | Poland |
| 2020s | 40.5 | 36.1 | 4.4 | Bosnia and Herzegovina |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher rate of electrification, Bosnia and Herzegovina or Poland?
- Bosnia and Herzegovina, at 38.47 against 35.48 in Poland as of 2022.
- What is the difference in rate of electrification between Bosnia and Herzegovina and Poland?
- 2.99, with Bosnia and Herzegovina ahead.
- How many years of comparable data are there for Bosnia and Herzegovina and Poland?
- 9 years are reported by both, from 2014 to 2022.
- How do Bosnia and Herzegovina and Poland rank globally for rate of electrification?
- Bosnia and Herzegovina ranks 17th and Poland ranks 19th of 39 countries.
- Where does this data come from?
- Eurostat, published as Rate of electrification. Statizoid refreshes it automatically from the source and publishes the full history for both places.