Spain vs Turkmenistan: Multi-party elections for legislature, gaps filled
Spain
1
in 2025
Turkmenistan
1
in 2025
Spain rank
1st
Turkmenistan rank
1st
Multi-party elections for legislature, gaps filled over time
- Spain
- Turkmenistan
How they compare
Spain currently reports 1 against 1 in Turkmenistan, a difference of 0.
The two have swapped places 4 times across 75 shared years of data; in 1917 it was Turkmenistan ahead.
Spain ranks 1st and Turkmenistan ranks 1st of 172 countries.
Spain has averaged higher in every one of the 10 decades both report.
Head to head by decade
| Decade | Spain | Turkmenistan | Difference | Ahead |
|---|---|---|---|---|
| 1910s | 1 | 1 | 0 | — |
| 1920s | 1 | 1 | 0 | — |
| 1930s | 1 | 0.6667 | 0.3333 | Spain |
| 1960s | 1 | 0 | 1 | Spain |
| 1970s | 1 | 0 | 1 | Spain |
| 1980s | 1 | 0.1 | 0.9 | Spain |
| 1990s | 1 | 0 | 1 | Spain |
| 2000s | 1 | 0 | 1 | Spain |
| 2010s | 1 | 0.2 | 0.8 | Spain |
| 2020s | 1 | 1 | 0 | — |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher multi-party elections for legislature, gaps filled, Spain or Turkmenistan?
- Spain, at 1 against 1 in Turkmenistan as of 2025.
- What is the difference in multi-party elections for legislature, gaps filled between Spain and Turkmenistan?
- 0, with Spain ahead.
- How many years of comparable data are there for Spain and Turkmenistan?
- 75 years are reported by both, from 1917 to 2025.
- How do Spain and Turkmenistan rank globally for multi-party elections for legislature, gaps filled?
- Spain ranks 1st and Turkmenistan ranks 1st of 172 countries.
- Where does this data come from?
- Statizoid (derived), published as Multi-party elections for legislature, gaps filled. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Multi-party elections for legislature with 240 missing years estimated by linear interpolation between the nearest real observations. Only gaps of 4 years or fewer are filled, and never beyond the first or last actual measurement — these are filled holes, not forecasts.