Sao Tome and Principe vs Serbia: Multi-party elections for legislature, gaps filled
Sao Tome and Principe
1
in 2025
Serbia
1
in 2025
Sao Tome and Principe rank
1st
Serbia rank
1st
Multi-party elections for legislature, gaps filled over time
- Sao Tome and Principe
- Serbia
How they compare
Sao Tome and Principe currently reports 1 against 1 in Serbia, a difference of 0.
The two have swapped places 1 time across 35 shared years of data; in 1991 it was Sao Tome and Principe ahead.
Sao Tome and Principe ranks 1st and Serbia ranks 1st of 172 countries.
Sao Tome and Principe has averaged higher in every one of the 4 decades both report.
Head to head by decade
| Decade | Sao Tome and Principe | Serbia | Difference | Ahead |
|---|---|---|---|---|
| 1990s | 1 | 0.9444 | 0.0556 | Sao Tome and Principe |
| 2000s | 1 | 1 | 0 | — |
| 2010s | 1 | 1 | 0 | — |
| 2020s | 1 | 1 | 0 | — |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher multi-party elections for legislature, gaps filled, Sao Tome and Principe or Serbia?
- Sao Tome and Principe, at 1 against 1 in Serbia as of 2025.
- What is the difference in multi-party elections for legislature, gaps filled between Sao Tome and Principe and Serbia?
- 0, with Sao Tome and Principe ahead.
- How many years of comparable data are there for Sao Tome and Principe and Serbia?
- 35 years are reported by both, from 1991 to 2025.
- How do Sao Tome and Principe and Serbia rank globally for multi-party elections for legislature, gaps filled?
- Sao Tome and Principe ranks 1st and Serbia ranks 1st of 172 countries.
- Where does this data come from?
- Statizoid (derived), published as Multi-party elections for legislature, gaps filled. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Multi-party elections for legislature with 240 missing years estimated by linear interpolation between the nearest real observations. Only gaps of 4 years or fewer are filled, and never beyond the first or last actual measurement — these are filled holes, not forecasts.