Honduras vs Turkey: Multi-party elections for legislature, gaps filled
Honduras
1
in 2025
Turkey
1
in 2025
Honduras rank
1st
Turkey rank
1st
Multi-party elections for legislature, gaps filled over time
- Honduras
- Turkey
How they compare
Honduras currently reports 1 against 1 in Turkey, a difference of 0.
The two have swapped places 6 times across 95 shared years of data; in 1912 it was Turkey ahead.
Honduras ranks 1st and Turkey ranks 1st of 172 countries.
Honduras has averaged higher in every one of the 12 decades both report.
Head to head by decade
| Decade | Honduras | Turkey | Difference | Ahead |
|---|---|---|---|---|
| 1910s | 1 | 0.375 | 0.625 | Honduras |
| 1920s | 1 | 0.3 | 0.7 | Honduras |
| 1930s | 0.8 | 0 | 0.8 | Honduras |
| 1940s | 1 | 0.4 | 0.6 | Honduras |
| 1950s | 1 | 1 | 0 | — |
| 1960s | 1 | 1 | 0 | — |
| 1970s | 1 | 1 | 0 | — |
| 1980s | 1 | 1 | 0 | — |
| 1990s | 1 | 1 | 0 | — |
| 2000s | 1 | 1 | 0 | — |
| 2010s | 1 | 1 | 0 | — |
| 2020s | 1 | 1 | 0 | — |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher multi-party elections for legislature, gaps filled, Honduras or Turkey?
- Honduras, at 1 against 1 in Turkey as of 2025.
- What is the difference in multi-party elections for legislature, gaps filled between Honduras and Turkey?
- 0, with Honduras ahead.
- How many years of comparable data are there for Honduras and Turkey?
- 95 years are reported by both, from 1912 to 2025.
- How do Honduras and Turkey rank globally for multi-party elections for legislature, gaps filled?
- Honduras ranks 1st and Turkey ranks 1st of 172 countries.
- Where does this data come from?
- Statizoid (derived), published as Multi-party elections for legislature, gaps filled. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Multi-party elections for legislature with 240 missing years estimated by linear interpolation between the nearest real observations. Only gaps of 4 years or fewer are filled, and never beyond the first or last actual measurement — these are filled holes, not forecasts.