Kosovo* vs North Macedonia: Length of railway tracks by electrification of tracks
Kosovo*
440 Kilometre
in 2022
North Macedonia
908 Kilometre
in 2024
Kosovo* rank
45th
North Macedonia rank
43rd
Length of railway tracks by electrification of tracks over time
- Kosovo*
- North Macedonia
How they compare
North Macedonia currently reports 908 Kilometre against 440 Kilometre in Kosovo*, a difference of 468 Kilometre.
That makes North Macedonia's figure about 2.1 times Kosovo*'s.
Across all 6 years both countries report, North Macedonia has been ahead every year.
Kosovo* ranks 45th and North Macedonia ranks 43rd of 48 countries.
North Macedonia has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Kosovo* | North Macedonia | Difference | Ahead |
|---|---|---|---|---|
| 2010s | 440 Kilometre | 907 Kilometre | 467 Kilometre | North Macedonia |
| 2020s | 440 Kilometre | 907 Kilometre | 467 Kilometre | North Macedonia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher length of railway tracks by electrification of tracks, Kosovo* or North Macedonia?
- North Macedonia, at 908 Kilometre against 440 Kilometre in Kosovo* as of 2024.
- What is the difference in length of railway tracks by electrification of tracks between Kosovo* and North Macedonia?
- 468 Kilometre, with North Macedonia ahead.
- How many years of comparable data are there for Kosovo* and North Macedonia?
- 6 years are reported by both, from 2017 to 2022.
- How do Kosovo* and North Macedonia rank globally for length of railway tracks by electrification of tracks?
- Kosovo* ranks 45th and North Macedonia ranks 43rd of 48 countries.
- Where does this data come from?
- Eurostat, published as Length of railway tracks by electrification of tracks. Statizoid refreshes it automatically from the source and publishes the full history for both places.