Austria vs Bulgaria: Length of railway lines by number of tracks and electrification of
Austria
5,624 Kilometre
in 2024
Bulgaria
4,025 Kilometre
in 2024
Austria rank
16th
Bulgaria rank
18th
Length of railway lines by number of tracks and electrification of over time
- Austria
- Bulgaria
How they compare
Austria currently reports 5,624 Kilometre against 4,025 Kilometre in Bulgaria, a difference of 1,599 Kilometre.
That makes Austria's figure about 1.4 times Bulgaria's.
Across all 37 years both countries report, Austria has been ahead every year.
Austria ranks 16th and Bulgaria ranks 18th of 49 countries.
Austria has averaged higher in every one of the 6 decades both report.
Head to head by decade
| Decade | Austria | Bulgaria | Difference | Ahead |
|---|---|---|---|---|
| 1970s | 5,907 Kilometre | 4,196 Kilometre | 1,711 Kilometre | Austria |
| 1980s | 5,847 Kilometre | 4,267 Kilometre | 1,580 Kilometre | Austria |
| 1990s | 5,636 Kilometre | 4,293 Kilometre | 1,343 Kilometre | Austria |
| 2000s | 5,700 Kilometre | 4,227 Kilometre | 1,473 Kilometre | Austria |
| 2010s | 5,564 Kilometre | 4,043 Kilometre | 1,520 Kilometre | Austria |
| 2020s | 5,597 Kilometre | 4,029 Kilometre | 1,569 Kilometre | Austria |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher length of railway lines by number of tracks and electrification of, Austria or Bulgaria?
- Austria, at 5,624 Kilometre against 4,025 Kilometre in Bulgaria as of 2024.
- What is the difference in length of railway lines by number of tracks and electrification of between Austria and Bulgaria?
- 1,599 Kilometre, with Austria ahead.
- How many years of comparable data are there for Austria and Bulgaria?
- 37 years are reported by both, from 1970 to 2024.
- How do Austria and Bulgaria rank globally for length of railway lines by number of tracks and electrification of?
- Austria ranks 16th and Bulgaria ranks 18th of 49 countries.
- Where does this data come from?
- Eurostat, published as Length of railway lines by number of tracks and electrification of lines. Statizoid refreshes it automatically from the source and publishes the full history for both places.