Antigua and Barbuda vs Colombia: Ilo national vs modeled data, gaps filled
Antigua and Barbuda
8.78
in 2018
Colombia
8.43
in 2025
Antigua and Barbuda rank
44th
Colombia rank
46th
Ilo national vs modeled data, gaps filled over time
- Antigua and Barbuda
- Colombia
How they compare
Antigua and Barbuda currently reports 8.78 against 8.43 in Colombia, a difference of 0.35.
The two have swapped places 1 time across 5 shared years of data; in 1975 it was Antigua and Barbuda ahead.
Antigua and Barbuda ranks 44th and Colombia ranks 46th of 185 countries.
Across the 4 decades both report, Antigua and Barbuda averaged higher in 1 and Colombia in 3.
Head to head by decade
| Decade | Antigua and Barbuda | Colombia | Difference | Ahead |
|---|---|---|---|---|
| 1970s | 20.07 | 10.47 | 9.6 | Antigua and Barbuda |
| 1990s | 2.86 | 10.12 | 7.26 | Colombia |
| 2000s | 8.42 | 15.04 | 6.62 | Colombia |
| 2010s | 8.78 | 9.36 | 0.58 | Colombia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher ilo national vs modeled data, gaps filled, Antigua and Barbuda or Colombia?
- Antigua and Barbuda, at 8.78 against 8.43 in Colombia as of 2018.
- What is the difference in ilo national vs modeled data, gaps filled between Antigua and Barbuda and Colombia?
- 0.35, with Antigua and Barbuda ahead.
- How many years of comparable data are there for Antigua and Barbuda and Colombia?
- 5 years are reported by both, from 1975 to 2018.
- How do Antigua and Barbuda and Colombia rank globally for ilo national vs modeled data, gaps filled?
- Antigua and Barbuda ranks 44th and Colombia ranks 46th of 185 countries.
- Where does this data come from?
- Statizoid (derived), published as Ilo national vs modeled data, gaps filled. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Ilo national vs modeled data with 551 missing years estimated by linear interpolation between the nearest real observations. Only gaps of 4 years or fewer are filled, and never beyond the first or last actual measurement — these are filled holes, not forecasts.