Afghanistan vs South Sudan: Free and fair elections, gaps filled
Afghanistan
0
in 2021
South Sudan
0
in 2010
Afghanistan rank
112th
South Sudan rank
112th
Free and fair elections, gaps filled over time
- Afghanistan
- South Sudan
How they compare
Afghanistan currently reports 0 against 0 in South Sudan, a difference of 0.
The two have swapped places 2 times across 29 shared years of data; in 1948 it was South Sudan ahead.
Afghanistan ranks 112th and South Sudan ranks 112th of 172 countries.
Across the 7 decades both report, Afghanistan averaged higher in 1 and South Sudan in 4.
Head to head by decade
| Decade | Afghanistan | South Sudan | Difference | Ahead |
|---|---|---|---|---|
| 1940s | 0 | 0 | 0 | — |
| 1950s | 0 | 0.6667 | 0.6667 | South Sudan |
| 1960s | 0 | 0.9333 | 0.9333 | South Sudan |
| 1970s | 0 | 0.0833 | 0.0833 | South Sudan |
| 1980s | 0 | 1 | 1 | South Sudan |
| 2000s | 0.8333 | 0 | 0.8333 | Afghanistan |
| 2010s | 0 | 0 | 0 | — |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher free and fair elections, gaps filled, Afghanistan or South Sudan?
- Afghanistan, at 0 against 0 in South Sudan as of 2021.
- What is the difference in free and fair elections, gaps filled between Afghanistan and South Sudan?
- 0, with Afghanistan ahead.
- How many years of comparable data are there for Afghanistan and South Sudan?
- 29 years are reported by both, from 1948 to 2010.
- How do Afghanistan and South Sudan rank globally for free and fair elections, gaps filled?
- Afghanistan ranks 112th and South Sudan ranks 112th of 172 countries.
- Where does this data come from?
- Statizoid (derived), published as Free and fair elections, gaps filled. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Free and fair elections with 276 missing years estimated by linear interpolation between the nearest real observations. Only gaps of 4 years or fewer are filled, and never beyond the first or last actual measurement — these are filled holes, not forecasts.