Bhutan vs Republic of Moldova: Civil liberties rating, gaps filled
Bhutan
3
in 2025
Republic of Moldova
3
in 2025
Bhutan rank
97th
Republic of Moldova rank
97th
Civil liberties rating, gaps filled over time
- Bhutan
- Republic of Moldova
How they compare
Bhutan currently reports 3 against 3 in Republic of Moldova, a difference of 0.
The two have swapped places 4 times across 54 shared years of data; in 1972 it was Republic of Moldova ahead.
Bhutan ranks 97th and Republic of Moldova ranks 97th of 199 countries.
Across the 6 decades both report, Bhutan averaged higher in 4 and Republic of Moldova in 2.
Head to head by decade
| Decade | Bhutan | Republic of Moldova | Difference | Ahead |
|---|---|---|---|---|
| 1970s | 4.25 | 6 | 1.75 | Republic of Moldova |
| 1980s | 5 | 6.5 | 1.5 | Republic of Moldova |
| 1990s | 6.3 | 4.2 | 2.1 | Bhutan |
| 2000s | 5.2 | 4 | 1.2 | Bhutan |
| 2010s | 4.3 | 3.2 | 1.1 | Bhutan |
| 2020s | 3.67 | 3 | 0.6667 | Bhutan |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher civil liberties rating, gaps filled, Bhutan or Republic of Moldova?
- Bhutan, at 3 against 3 in Republic of Moldova as of 2025.
- What is the difference in civil liberties rating, gaps filled between Bhutan and Republic of Moldova?
- 0, with Bhutan ahead.
- How many years of comparable data are there for Bhutan and Republic of Moldova?
- 54 years are reported by both, from 1972 to 2025.
- How do Bhutan and Republic of Moldova rank globally for civil liberties rating, gaps filled?
- Bhutan ranks 97th and Republic of Moldova ranks 97th of 199 countries.
- Where does this data come from?
- Statizoid (derived), published as Civil liberties rating, gaps filled. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
Civil liberties rating with 183 missing years estimated by linear interpolation between the nearest real observations. Only gaps of 4 years or fewer are filled, and never beyond the first or last actual measurement — these are filled holes, not forecasts.