Netherlands vs Spain: Biofuel production by region
Netherlands
38.13 terawatt-hours
in 2025
Spain
20.32 terawatt-hours
in 2025
Netherlands rank
7th
Spain rank
8th
Biofuel production by region over time
- Netherlands
- Spain
How they compare
Netherlands currently reports 38.13 terawatt-hours against 20.32 terawatt-hours in Spain, a difference of 17.81 terawatt-hours.
That makes Netherlands's figure about 1.9 times Spain's.
The two have swapped places 3 times across 22 shared years of data; in 2004 it was Spain ahead.
Netherlands ranks 7th and Spain ranks 8th of 24 countries.
Individual pages
About this data
Includes biogasoline (such as ethanol) and biodiesel. Volumes have been adjusted for energy content.