Peru vs Taiwan: Annual change in primary energy from hydropower

Peru
1.96 terawatt-hours
in 2025
Taiwan
1.29 terawatt-hours
in 2025
Peru rank
13th
Taiwan rank
15th

Annual change in primary energy from hydropower over time

  • Peru
  • Taiwan
-2024196619952025

How they compare

Peru currently reports 1.96 terawatt-hours against 1.29 terawatt-hours in Taiwan, a difference of 0.67 terawatt-hours.

That makes Peru's figure about 1.5 times Taiwan's.

The two have swapped places 36 times across 60 shared years of data; in 1966 it was Peru ahead.

Peru ranks 13th and Taiwan ranks 15th of 80 countries.

Peru has averaged higher in every one of the 7 decades both report.

Head to head by decade

Decade Peru Taiwan Difference Ahead
1960s 0.269 terawatt-hours 0.1165 terawatt-hours 0.1525 terawatt-hours Peru
1970s 0.3002 terawatt-hours 0.1515 terawatt-hours 0.1487 terawatt-hours Peru
1980s 0.3804 terawatt-hours 0.0296 terawatt-hours 0.3508 terawatt-hours Peru
1990s 0.4034 terawatt-hours 0.0188 terawatt-hours 0.3846 terawatt-hours Peru
2000s 0.5363 terawatt-hours -0.1303 terawatt-hours 0.6666 terawatt-hours Peru
2010s 1.16 terawatt-hours 0.1796 terawatt-hours 0.9762 terawatt-hours Peru
2020s 0.4224 terawatt-hours -0.0076 terawatt-hours 0.43 terawatt-hours Peru

Averages of every year both report within each decade.

Frequently asked questions

Which has higher annual change in primary energy from hydropower, Peru or Taiwan?
Peru, at 1.96 terawatt-hours against 1.29 terawatt-hours in Taiwan as of 2025.
What is the difference in annual change in primary energy from hydropower between Peru and Taiwan?
0.67 terawatt-hours, with Peru ahead.
How many years of comparable data are there for Peru and Taiwan?
60 years are reported by both, from 1966 to 2025.
How do Peru and Taiwan rank globally for annual change in primary energy from hydropower?
Peru ranks 13th and Taiwan ranks 15th of 80 countries.
Where does this data come from?
Energy Institute – Statistical Review of World Energy (2026) – with major processing by Our World in Data, published as Annual change in primary energy from hydropower. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Peru vs Taiwan: Annual change in primary energy from hydropower. Statizoid, drawing on Energy Institute – Statistical Review of World Energy (2026) – with major processing by Our World in Data. Retrieved 23 September 2026, from https://reference.statizoid.com/compare/annual-change-hydro/peru/taiwan/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (Our World in Data); please keep the attribution.

<a href="https://reference.statizoid.com/compare/annual-change-hydro/peru/taiwan/">Peru vs Taiwan: Annual change in primary energy from hydropower</a> — Statizoid

About this data

Indicator
Annual change in primary energy from hydropower
Unit
terawatt-hours
Source
Energy Institute – Statistical Review of World Energy (2026) – with major processing by Our World in Data
Licence
CC BY 4.0 (Our World in Data)
Coverage
82 places, 4,604 data points, 1966–2025
Last refreshed

Change in total energy supply relative to the previous year, measured in terawatt-hours.