Egypt vs Spain: Annual change in primary energy from hydropower
Egypt
-0.6183 terawatt-hours
in 2025
Spain
-0.6693 terawatt-hours
in 2025
Egypt rank
53rd
Spain rank
54th
Annual change in primary energy from hydropower over time
- Egypt
- Spain
How they compare
Egypt currently reports -0.6183 terawatt-hours against -0.6693 terawatt-hours in Spain, a difference of 0.051 terawatt-hours.
The two have swapped places 39 times across 60 shared years of data; in 1966 it was Spain ahead.
Egypt ranks 53rd and Spain ranks 54th of 77 countries.
Individual pages
About this data
Change in total energy supply relative to the previous year, measured in terawatt-hours.