Canada vs Peru: Annual change in primary energy from hydropower

Canada
1.57 terawatt-hours
in 2025
Peru
1.96 terawatt-hours
in 2025
Canada rank
14th
Peru rank
13th

Annual change in primary energy from hydropower over time

  • Canada
  • Peru
-40-20020196619952025

How they compare

Peru currently reports 1.96 terawatt-hours against 1.57 terawatt-hours in Canada, a difference of 0.39 terawatt-hours.

That makes Peru's figure about 1.2 times Canada's.

The two have swapped places 23 times across 60 shared years of data; in 1966 it was Canada ahead.

Canada ranks 14th and Peru ranks 13th of 80 countries.

Across the 7 decades both report, Canada averaged higher in 6 and Peru in 1.

Head to head by decade

Decade Canada Peru Difference Ahead
1960s 8.14 terawatt-hours 0.269 terawatt-hours 7.87 terawatt-hours Canada
1970s 9.35 terawatt-hours 0.3002 terawatt-hours 9.05 terawatt-hours Canada
1980s 4.63 terawatt-hours 0.3804 terawatt-hours 4.25 terawatt-hours Canada
1990s 5.46 terawatt-hours 0.4034 terawatt-hours 5.05 terawatt-hours Canada
2000s 2.37 terawatt-hours 0.5363 terawatt-hours 1.83 terawatt-hours Canada
2010s 1.31 terawatt-hours 1.16 terawatt-hours 0.1525 terawatt-hours Canada
2020s -5.55 terawatt-hours 0.4224 terawatt-hours 5.97 terawatt-hours Peru

Averages of every year both report within each decade.

Frequently asked questions

Which has higher annual change in primary energy from hydropower, Canada or Peru?
Peru, at 1.96 terawatt-hours against 1.57 terawatt-hours in Canada as of 2025.
What is the difference in annual change in primary energy from hydropower between Canada and Peru?
0.39 terawatt-hours, with Peru ahead.
How many years of comparable data are there for Canada and Peru?
60 years are reported by both, from 1966 to 2025.
How do Canada and Peru rank globally for annual change in primary energy from hydropower?
Canada ranks 14th and Peru ranks 13th of 80 countries.
Where does this data come from?
Energy Institute – Statistical Review of World Energy (2026) – with major processing by Our World in Data, published as Annual change in primary energy from hydropower. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Canada vs Peru: Annual change in primary energy from hydropower. Statizoid, drawing on Energy Institute – Statistical Review of World Energy (2026) – with major processing by Our World in Data. Retrieved 23 September 2026, from https://reference.statizoid.com/compare/annual-change-hydro/canada/peru/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (Our World in Data); please keep the attribution.

<a href="https://reference.statizoid.com/compare/annual-change-hydro/canada/peru/">Canada vs Peru: Annual change in primary energy from hydropower</a> — Statizoid

About this data

Indicator
Annual change in primary energy from hydropower
Unit
terawatt-hours
Source
Energy Institute – Statistical Review of World Energy (2026) – with major processing by Our World in Data
Licence
CC BY 4.0 (Our World in Data)
Coverage
82 places, 4,604 data points, 1966–2025
Last refreshed

Change in total energy supply relative to the previous year, measured in terawatt-hours.